inside
inside
  • INSIDE Home
  • Who We Are
    • About Us
    • The Team
    • Main Contractor
    • Engineering
    • Design Management
    • Quality Management
    • Sustainability
  • Case Studies
    • South Staffs College
    • Cofa Courtyard, Coventry
    • Blenheim Court, Solihull
    • 24 Hills Road Cambridge
    • James Watt College
    • London Square Guildford
    • St Marks, Leeds
    • Coventry College
    • Buckhurst Hill Nursery
    • Bright Horizons
    • Level 9 City Tower
    • Altius House
    • 19th & 24th City Tower
    • 28th Floor City Tower
    • Beavertown Brewery
    • St Mary's COE
    • Maritime Trafford Park
    • The Hive
    • Clifton Park York
    • Endeavour House Stansted
    • Novel Marketing Suites
    • Victoria COE
    • Camberley Theatre
    • Barry Callebaut
  • Contact Us
  • More
    • INSIDE Home
    • Who We Are
      • About Us
      • The Team
      • Main Contractor
      • Engineering
      • Design Management
      • Quality Management
      • Sustainability
    • Case Studies
      • South Staffs College
      • Cofa Courtyard, Coventry
      • Blenheim Court, Solihull
      • 24 Hills Road Cambridge
      • James Watt College
      • London Square Guildford
      • St Marks, Leeds
      • Coventry College
      • Buckhurst Hill Nursery
      • Bright Horizons
      • Level 9 City Tower
      • Altius House
      • 19th & 24th City Tower
      • 28th Floor City Tower
      • Beavertown Brewery
      • St Mary's COE
      • Maritime Trafford Park
      • The Hive
      • Clifton Park York
      • Endeavour House Stansted
      • Novel Marketing Suites
      • Victoria COE
      • Camberley Theatre
      • Barry Callebaut
    • Contact Us
  • INSIDE Home
  • Who We Are
    • About Us
    • The Team
    • Main Contractor
    • Engineering
    • Design Management
    • Quality Management
    • Sustainability
  • Case Studies
    • South Staffs College
    • Cofa Courtyard, Coventry
    • Blenheim Court, Solihull
    • 24 Hills Road Cambridge
    • James Watt College
    • London Square Guildford
    • St Marks, Leeds
    • Coventry College
    • Buckhurst Hill Nursery
    • Bright Horizons
    • Level 9 City Tower
    • Altius House
    • 19th & 24th City Tower
    • 28th Floor City Tower
    • Beavertown Brewery
    • St Mary's COE
    • Maritime Trafford Park
    • The Hive
    • Clifton Park York
    • Endeavour House Stansted
    • Novel Marketing Suites
    • Victoria COE
    • Camberley Theatre
    • Barry Callebaut
  • Contact Us

Managing your Project

Getting the project started:

When a project goes live, the Inside delivery team take care of everything from setting up the site to arranging surveys and validations. 


We produce all necessary health and safety documentation, liaise with the local authority and create detailed logistical plans. 


Inside are used to working in "live" buildings and so we understand that we must ensure "business as usual" 

Here's what our client's say

"Just wanted to drop you a note to thank you for your incredible hospitality and the smooth building works process, all of your team demonstrated and exuded professionalism and the project has without a doubt been successful"


  

Gemma Knott

Coventry College

Managing the process:


Our highly skilled project managers and site engineers manage the design phase of the project. From architectural drawings, mechanical and electrical designs, technical proposals to samples for approval, they manage the process start to finish.


The team will manage the flow of information, document and control any changes to the design as well as hold regular meetings and report on progress.


Our commercial managers work closely with our project managers, subcontractors and suppliers to produce detailed programs and procurement schedules. 


Regular quality checks are carried out, bench marks and hold points agreed with the specialist subcontractors and the client’s team. We ensure that the quality of the installation is achieved through monitoring and early identification and prevention of defects.


Closing Out:


Between 4-6 weeks prior to project completion, the Inside Project Finalisation Plan is implemented. We call this process “Inside Out” 


The process is designed to ensure that no stone is left uncovered, that all elements of the works will complete on time and to the highest standard. 

Size of Projects

Inside undertake commercial fit out, refurbishment and construction projects from £100k to £10m

Speak to a member of the team

Inside Head Office - 01908 915 915  -   Manchester Office - 0161 791 40 50  -  Copyright © 2018 Inside limited - All Rights Reserved.

  • Contact Us

Powered by

This website uses cookies.

We use cookies to analyze website traffic and optimize your website experience. By accepting our use of cookies, your data will be aggregated with all other user data.

DeclineAccept