James Watt College, Ground Floor, Black Stone Wing
Former changing rooms and classrooms were stripped out and all new multi-purpose teaching spaces have been installed including material testing labs and a lecture theatre.
The Design & Build project was completed within 9 weeks on site during terms time.
The works included:
- Strip out
- General Builders works / Structural Alterations
- M&E /controls/ fire alarms
- Fire stopping
- New ceiling tiles and ceiling repairs
- Décor through out
- Fixed staged seating
- New floor coverings
- Blinds
- Mastic
Client: Bmet
Project Manager & Cost Consultant: Bmet
Services Consultant: Inside
Architect: Inside / TKA Space Studio